| RFQ/OBP125/2026/27 |
Request for Quote |
Rabbit IFN-gamma ELISA Kit |
The vendor shall supply and deliver one complete, factory-sealed 96-well sandwich ELISA kit containing all chemical reagents and components necessary to quantify Rabbit Interferon-gamma (IFN-γ). The kit must include a pre-coated plate with a specific capture antibody, alongside pre-measured vials of lyophilized rabbit IFN-γ protein standards, biotinylated detection antibodies, and Horseradish Peroxidase (HRP)-Streptavidin conjugate. Additionally, the shipment must include all required operational liquids, specifically concentrated wash buffer solutions, a specialized protein stabilization assay diluent, tetramethylbenzidine (TMB) color-developing substrate, and an acidic sulfuric acid stop solution. |
|
No |
2026/07/23 15:00:00 |
| RFQ/OBP570/2024/25 |
Request for Quote |
Rabbit Pellets |
Provide Rabbit Pellets |
Provide Rabbit Pellets |
No |
2025/04/03 15:00:00 |
| RFQ/OBP447/2024/25 |
Request for Quote |
Rabbit Pellets |
Rabbit Pallets |
Rabbit Pallets |
No |
2024/12/04 15:00:00 |
| RFQ/OBP173/2025/26 |
Request for Quote |
Rabbit Pellets_ |
Provide 8 Tons of Rabbit Pellets |
Provide 8 Tons of Rabbit Pellets |
No |
2025/09/30 15:00:00 |
| RFQ/OBP217/2026/27 |
Request for Quote |
Reagents for the ELISA |
Quantity Product/Item Code Specification 2 Sigma-Aldrich product number: A5295 Anti-Bovine IgG (Whole molecule)-Peroxidase antibody produced in rabbit, 1 mL 1 Sigma-Aldrich product number: ES022 TMB/E Ultra Sensitive, Blue, Horseradish Peroxidase Substrate (soluble) (Sure Blue TMB), 500 mL 5 Sigma-Aldrich product number: M7409 Nonfat-dried Milk bovine, 5 Bottles (For research purposes) |
|
No |
2026/09/08 16:00:00 |
| RFP/OBP13/25/RDV01 |
Request for Proposal |
Real time Cell analyser |
Tender appointment of the service provider to provide a Real time Cell analyser for Onderstepoort biological products OB |
Refer to RFP document |
No |
2026/03/03 13:00:00 |
| RFQ/OBP427/2025/26 |
Request for Quote |
Reconstruction of Heavy-Duty Concrete Apron – Warehouse Truck Access |
Reconstruction of Heavy-Duty Concrete Apron – Warehouse Truck Access TECHNICAL SPECIFICATION Reconstruction of Heavy-Duty Concrete Apron – Warehouse Truck Access 1.0 PROJECT DESCRIPTION AND DESIGN INTENT The works comprise the demolition, earthworks, construction and commissioning of a heavy-duty reinforced concrete apron at the warehouse entrance and truck manoeuvring area. The apron shall be designed and constructed to withstand: Repeated loading from 30-tonne gross vehicle mass trucks High point loads from axle loads, braking, turning and stationary wheel loads Abrasion from coal spillage and steel-rimmed vehicles Exposure to weather, water ingress and oil contamination The apron shall achieve a minimum design life of 25 years with normal maintenance. 2.0 APPLICABLE STANDARDS (NON-NEGOTIABLE) All works shall comply with the latest editions of: SANS 1200 (where applicable) COLTO Standard Specifications SANS 10100-1 – Structural use of concrete SANS 5863 – Concrete testing TMH1 / TMH10 – Road materials and methods Construction Regulations as amended OHSAct as amended Tshwane Municipal bylaws In the unlikely event where conflict exists, the more stringent requirement shall apply. 3.0 CONTRACTOR’S GENERAL OBLIGATIONS 3.1 The Contractor shall provide all labour, plant, materials, supervision, testing, protection and temporary works necessary to complete the works. 3.2 The Contractor shall: Locate, mark and protect all existing underground and surface services Provide method statements for demolition, compaction, concreting and curing Provide traffic control to maintain safe truck & traffic operations where required. NB: The area serves both staff (pedestrian & those in motor vehicles) and delivery trucks entrance and exit. Be fully responsible for quality control and testing 3.3 No work may proceed to the next stage without written approval by the appointed structural Engineer. OBP shall appoint in writing an independent structural Engineer 4.0 STAGE 1 – DEMOLITION AND REMOVAL OF EXISTING CONCRETE 4.1 Breaking and Demolition Mechanically break and remove all existing concrete slabs, foundations and edges within the defined apron footprint. Care shall be taken not to disturb subgrade beyond required excavation depth. 4.2 Disposal All rubble shall be: Loaded Transported Disposed of at a licensed waste facility Proof of disposal shall be provided to OBP's OHS officer. 4.3 Temporary Protection Adjacent staff parking, security office, structures and services shall be protected at all times. THE CONTRACTOR SHALL ENSURE ADEQUATE PROTECTION TO THE NITROGEN BULK SUPPLY AS WELL AS ASSOCIATED SUPPLY POINTS. OBP shall arrange with the nitrogen gas supplier, Afrox for a delivery hose long enough to reach the bulk supply supply vessel from the refilling truck most likely close to the staff parking area. The positioning of the Afrox delivery truck shall be controlled by Distribution department who shall adopt all reasonable steps to ensure maximum cooperation. After hours deliveries shall be handled by security. Both security and Distribution shall ensure that the area under construction is out of bounds to both foot and mechanised traffic until officially handed over. 5.0 STAGE 2 – EARTHWORKS AND SUBGRADE PREPARATION 5.1 Excavation Excavate to 500 mm below finished concrete level (FCL). Excavation tolerance: ±20 mm. Soft spots, unsuitable material or waterlogged areas shall be removed and replaced at the Contractor’s cost. PLEASE NOTE THIS POINT. 5.2 Subgrade Preparation Exposed subgrade shall be: Scarified to 150 mm Moisture conditioned Compacted to ≥93% Mod AASHTO 5.3 Imported G5 Layer Supply and place G5 natural gravel complying with COLTO. Compacted thickness: 200 mm Compaction: ≥95% Mod AASHTO Layer shall be levelled to ±10 mm tolerance. 5.4 Proof Rolling Proof roll the prepared base with a loaded truck or roller. Any deflection or pumping shall be rectified before proceeding. 6.0 STAGE 3 – FORMWORK, JOINTS AND EDGE RESTRAINT 6.1 Formwork Rigid steel or timber formwork securely fixed. No deformation under concrete pressure. Release agents shall not contaminate concrete. 6.2 Movement Joints (Critical) Provide saw-cut contraction joints at: Maximum 4.0 m × 4.0 m panels Saw cutting depth: one quarter of slab thickness Timing: within 12 - 18 hours after pouring 6.3 Construction Joints Dowels required at construction joints: 20 mm Ø smooth dowels 450 mm long At 300 mm centres Bond breaker on one side 7.0 STAGE 4 – REINFORCEMENT 7.1 Reinforcement Type High-yield deformed bars, minimum grade Y500 7.2 Reinforcement Layout 10 mm Ø bars @ 200 mm centres both directions One continuous layer 7.3 Cover Minimum concrete cover: 50 mm Spacers: Precast concrete or heavy-duty plastic chairs Max spacing: 1.0 m 7.4 Fixing All intersections tied with 1.6 mm annealed wire No loose bars permitted 8.0 STAGE 5 – CONCRETE WORKS (HEAVY DUTY) 8.1 Concrete Specification Ready-mix concrete from approved plant. OBP reserves the right to request an original certificate from the ready-mix concrete supplier. Strength: 30 MPa @ 28 days Maximum water-cement ratio: 0.50 Slump: 75–100 mm Cement type suitable for abrasion resistance 8.2 Slab Thickness Minimum slab thickness: 250 mm (This is essential for 30-tonne trucks; thinner slabs are unacceptable) 8.3 Placement Continuous pour where possible No cold joints without approval Mechanical vibration compulsory 8.4 Finishing Strike off to level Power-float finish Final surface to be: Non-slip Hard-wearing Free of laitance 8.5 Falls and Drainage Minimum fall: 1:60 away from buildings No ponding permitted 9.0 STAGE 6 – CURING AND PROTECTION 9.1 Curing Apply curing compound or Cover with plastic/hessian for minimum 7 days 9.2 Protection No vehicle access for: 7 days (light traffic) 14 days (heavy trucks) Full loading only after 28 days 10.0 TESTING AND QUALITY CONTROL Compaction tests per layer Concrete: Slump tests Minimum 3 test cubes per pour Test results to be submitted to Client 11.0 COMPLETION AND HANDOVER Remove all surplus materials Clean site thoroughly Submit: Test results As-built levels Concrete delivery notes BILL OF QUANTITIES (BOQ – MEASURED WORKS) Item Description Unit Quantity 1 Site establishment, traffic control & safety Sum 1 2 Break and remove existing concrete m² TBD 3 Load, haul & dispose rubble m³ TBD 4 Excavation to 500 mm depth m³ TBD 5 Subgrade scarification & compaction (93%) m² TBD 6 Supply & place G5 (200 mm compacted) m³ TBD 7 Compaction testing Sum 1 8 Formwork to slab edges m TBD 9 Reinforcement Y10 @ 200 mm c/c kg TBD 10 Spacers & tying wire Sum 1 11 30 MPa concrete (250 mm thick) m³ ±142 12 Concrete vibration & finishing m² TBD 13 Saw-cut joints m TBD 14 Dowels at construction joints No TBD 15 Curing & protection m² TBD 16 Testing (slump & cubes) Sum 1 17 Final cleaning & demobilisation Sum 1 12.0 OBP SHALL DEPLOY ONE OF ITS STAFF MEMBERS FROM THE EMU DEPARTMENT TO THE WAREHOUSE APRON AREA WHEN THE WORK BEGINS IN THE INTERESTS OF OBP |
Reconstruction of Heavy-Duty Concrete Apron – Warehouse Truck Access TECHNICAL SPECIFICATION Reconstruction of Heavy-Duty Concrete Apron – Warehouse Truck Access 1.0 PROJECT DESCRIPTION AND DESIGN INTENT The works comprise the demolition, earthworks, construction and commissioning of a heavy-duty reinforced concrete apron at the warehouse entrance and truck manoeuvring area. The apron shall be designed and constructed to withstand: Repeated loading from 30-tonne gross vehicle mass trucks High point loads from axle loads, braking, turning and stationary wheel loads Abrasion from coal spillage and steel-rimmed vehicles Exposure to weather, water ingress and oil contamination The apron shall achieve a minimum design life of 25 years with normal maintenance. 2.0 APPLICABLE STANDARDS (NON-NEGOTIABLE) All works shall comply with the latest editions of: SANS 1200 (where applicable) COLTO Standard Specifications SANS 10100-1 – Structural use of concrete SANS 5863 – Concrete testing TMH1 / TMH10 – Road materials and methods Construction Regulations as amended OHSAct as amended Tshwane Municipal bylaws In the unlikely event where conflict exists, the more stringent requirement shall apply. 3.0 CONTRACTOR’S GENERAL OBLIGATIONS 3.1 The Contractor shall provide all labour, plant, materials, supervision, testing, protection and temporary works necessary to complete the works. 3.2 The Contractor shall: Locate, mark and protect all existing underground and surface services Provide method statements for demolition, compaction, concreting and curing Provide traffic control to maintain safe truck & traffic operations where required. NB: The area serves both staff (pedestrian & those in motor vehicles) and delivery trucks entrance and exit. Be fully responsible for quality control and testing 3.3 No work may proceed to the next stage without written approval by the appointed structural Engineer. OBP shall appoint in writing an independent structural Engineer 4.0 STAGE 1 – DEMOLITION AND REMOVAL OF EXISTING CONCRETE 4.1 Breaking and Demolition Mechanically break and remove all existing concrete slabs, foundations and edges within the defined apron footprint. Care shall be taken not to disturb subgrade beyond required excavation depth. 4.2 Disposal All rubble shall be: Loaded Transported Disposed of at a licensed waste facility Proof of disposal shall be provided to OBP's OHS officer. 4.3 Temporary Protection Adjacent staff parking, security office, structures and services shall be protected at all times. THE CONTRACTOR SHALL ENSURE ADEQUATE PROTECTION TO THE NITROGEN BULK SUPPLY AS WELL AS ASSOCIATED SUPPLY POINTS. OBP shall arrange with the nitrogen gas supplier, Afrox for a delivery hose long enough to reach the bulk supply supply vessel from the refilling truck most likely close to the staff parking area. The positioning of the Afrox delivery truck shall be controlled by Distribution department who shall adopt all reasonable steps to ensure maximum cooperation. After hours deliveries shall be handled by security. Both security and Distribution shall ensure that the area under construction is out of bounds to both foot and mechanised traffic until officially handed over. 5.0 STAGE 2 – EARTHWORKS AND SUBGRADE PREPARATION 5.1 Excavation Excavate to 500 mm below finished concrete level (FCL). Excavation tolerance: ±20 mm. Soft spots, unsuitable material or waterlogged areas shall be removed and replaced at the Contractor’s cost. PLEASE NOTE THIS POINT. 5.2 Subgrade Preparation Exposed subgrade shall be: Scarified to 150 mm Moisture conditioned Compacted to ≥93% Mod AASHTO 5.3 Imported G5 Layer Supply and place G5 natural gravel complying with COLTO. Compacted thickness: 200 mm Compaction: ≥95% Mod AASHTO Layer shall be levelled to ±10 mm tolerance. 5.4 Proof Rolling Proof roll the prepared base with a loaded truck or roller. Any deflection or pumping shall be rectified before proceeding. 6.0 STAGE 3 – FORMWORK, JOINTS AND EDGE RESTRAINT 6.1 Formwork Rigid steel or timber formwork securely fixed. No deformation under concrete pressure. Release agents shall not contaminate concrete. 6.2 Movement Joints (Critical) Provide saw-cut contraction joints at: Maximum 4.0 m × 4.0 m panels Saw cutting depth: one quarter of slab thickness Timing: within 12 - 18 hours after pouring 6.3 Construction Joints Dowels required at construction joints: 20 mm Ø smooth dowels 450 mm long At 300 mm centres Bond breaker on one side 7.0 STAGE 4 – REINFORCEMENT 7.1 Reinforcement Type High-yield deformed bars, minimum grade Y500 7.2 Reinforcement Layout 10 mm Ø bars @ 200 mm centres both directions One continuous layer 7.3 Cover Minimum concrete cover: 50 mm Spacers: Precast concrete or heavy-duty plastic chairs Max spacing: 1.0 m 7.4 Fixing All intersections tied with 1.6 mm annealed wire No loose bars permitted 8.0 STAGE 5 – CONCRETE WORKS (HEAVY DUTY) 8.1 Concrete Specification Ready-mix concrete from approved plant. OBP reserves the right to request an original certificate from the ready-mix concrete supplier. Strength: 30 MPa @ 28 days Maximum water-cement ratio: 0.50 Slump: 75–100 mm Cement type suitable for abrasion resistance 8.2 Slab Thickness Minimum slab thickness: 250 mm (This is essential for 30-tonne trucks; thinner slabs are unacceptable) 8.3 Placement Continuous pour where possible No cold joints without approval Mechanical vibration compulsory 8.4 Finishing Strike off to level Power-float finish Final surface to be: Non-slip Hard-wearing Free of laitance 8.5 Falls and Drainage Minimum fall: 1:60 away from buildings No ponding permitted 9.0 STAGE 6 – CURING AND PROTECTION 9.1 Curing Apply curing compound or Cover with plastic/hessian for minimum 7 days 9.2 Protection No vehicle access for: 7 days (light traffic) 14 days (heavy trucks) Full loading only after 28 days 10.0 TESTING AND QUALITY CONTROL Compaction tests per layer Concrete: Slump tests Minimum 3 test cubes per pour Test results to be submitted to Client 11.0 COMPLETION AND HANDOVER Remove all surplus materials Clean site thoroughly Submit: Test results As-built levels Concrete delivery notes BILL OF QUANTITIES (BOQ – MEASURED WORKS) Item Description Unit Quantity 1 Site establishment, traffic control & safety Sum 1 2 Break and remove existing concrete m² TBD 3 Load, haul & dispose rubble m³ TBD 4 Excavation to 500 mm depth m³ TBD 5 Subgrade scarification & compaction (93%) m² TBD 6 Supply & place G5 (200 mm compacted) m³ TBD 7 Compaction testing Sum 1 8 Formwork to slab edges m TBD 9 Reinforcement Y10 @ 200 mm c/c kg TBD 10 Spacers & tying wire Sum 1 11 30 MPa concrete (250 mm thick) m³ ±142 12 Concrete vibration & finishing m² TBD 13 Saw-cut joints m TBD 14 Dowels at construction joints No TBD 15 Curing & protection m² TBD 16 Testing (slump & cubes) Sum 1 17 Final cleaning & demobilisation Sum 1 12.0 OBP SHALL DEPLOY ONE OF ITS STAFF MEMBERS FROM THE EMU DEPARTMENT TO THE WAREHOUSE APRON AREA WHEN THE WORK BEGINS IN THE INTERESTS OF OBP |
2026/03/26 11:00:00 |
No |
2026/04/02 15:00:00 |
| RFQ/OBP486/2024/25 |
Request for Quote |
REFRIGERATION 6 MONTHS MAINTENANCE CONTRACT |
Table 1: Service Requirements OBP has on site refrigeration systems for vaccines preservations and air conditioning systems to keep cold rooms below specific temperatures. OBP also have heat pumps that are used for heating buildings and producing industrial process heat. OBP requires a supplier with expert service knowledge of Carnot refrigeration cycle, capable of evaluating principal work and heat transfers, enhancement of the vapour-compression systems, knowledge of cascade cycles, multistage compression with intercooling and knowledge of Carnot heat pump cycles. Service providers must have demonstrated knowledge of working on the following equipment (please note that this list is not exhaustive): • Refrigerators • Ultra Deep Temperature Freezers • Cold-rooms • Incubators • Air conditioners/ air conditioner replacement if needed under authorisation • Freeze Dryers • Chillers • Provide proof of experience of working on Freeze dryer • Air Handling Unit (EA and VP) . . Onsite Service Required Includes: On-site refrigeration maintenance service level agreement (1 x Refrigeration Technician & 1 x Assistant) for 8 hrs/day x 5 days per week for a period of 6 months. Must include 24/7 emergency standby support with a maximum on-site response time of 1 hour. 100 hours overtime for 1 Refrigeration Technician and 100 hours for 1 Assistant to be included in quote. Refrigeration Technician must be trade-tested with minimum 3 years of industrial refrigeration experience. Must be competent to maintain air conditioners, Chillers, cold rooms, and freezer rooms. Refrigeration Technician must hold a valid SAQCCA Gas Authorised Technician card. CVs of technician and assistant must be included in quotation. Any new refrigeration units (including refrigerators, air conditioners, incubators and cold rooms), gas, materials, consumables, replacement parts, etc required must be supplied at proven retail cost plus a mark-up of maximum 8% (to be included in the SLA) The refrigeration maintenance service team must be equipped with the necessary tools of the trade and must have their own transport to and from site and have sufficient cash flow to purchase materials and spares as required. A standard hardcopy safety file must be allowed for and submitted before any on-site work commences. Additional Requirements to Note: OBP reserves the right to check competency from the potential suppliers using any acceptable engineering measures. All parts, components and services provided will be subjected to not less than 6 months warranty. Performance bonds up to 8% of the whole invoice may be withhold as a guarantee and paid once the 6 months warranty period has elapsed. Agreements meetings will be conducted between supplier and OBP (i.e., legal, finance, procurement, and engineering departments) |
Table 1: Service Requirements OBP has on site refrigeration systems for vaccines preservations and air conditioning systems to keep cold rooms below specific temperatures. OBP also have heat pumps that are used for heating buildings and producing industrial process heat. OBP requires a supplier with expert service knowledge of Carnot refrigeration cycle, capable of evaluating principal work and heat transfers, enhancement of the vapour-compression systems, knowledge of cascade cycles, multistage compression with intercooling and knowledge of Carnot heat pump cycles. Service providers must have demonstrated knowledge of working on the following equipment (please note that this list is not exhaustive): • Refrigerators • Ultra Deep Temperature Freezers • Cold-rooms • Incubators • Air conditioners/ air conditioner replacement if needed under authorisation • Freeze Dryers • Chillers • Provide proof of experience of working on Freeze dryer • Air Handling Unit (EA and VP) . . Onsite Service Required Includes: On-site refrigeration maintenance service level agreement (1 x Refrigeration Technician & 1 x Assistant) for 8 hrs/day x 5 days per week for a period of 6 months. Must include 24/7 emergency standby support with a maximum on-site response time of 1 hour. 100 hours overtime for 1 Refrigeration Technician and 100 hours for 1 Assistant to be included in quote. Refrigeration Technician must be trade-tested with minimum 3 years of industrial refrigeration experience. Must be competent to maintain air conditioners, Chillers, cold rooms, and freezer rooms. Refrigeration Technician must hold a valid SAQCCA Gas Authorised Technician card. CVs of technician and assistant must be included in quotation. Any new refrigeration units (including refrigerators, air conditioners, incubators and cold rooms), gas, materials, consumables, replacement parts, etc required must be supplied at proven retail cost plus a mark-up of maximum 8% (to be included in the SLA) The refrigeration maintenance service team must be equipped with the necessary tools of the trade and must have their own transport to and from site and have sufficient cash flow to purchase materials and spares as required. A standard hardcopy safety file must be allowed for and submitted before any on-site work commences. Additional Requirements to Note: OBP reserves the right to check competency from the potential suppliers using any acceptable engineering measures. All parts, components and services provided will be subjected to not less than 6 months warranty. Performance bonds up to 8% of the whole invoice may be withhold as a guarantee and paid once the 6 months warranty period has elapsed. Agreements meetings will be conducted between supplier and OBP (i.e., legal, finance, procurement, and engineering departments) |
2025/01/22 11:00:00 |
No |
2025/01/28 15:00:00 |
| RFQ/OBP320/2025/26 |
Request for Quote |
Refrigeration contractor to be appointed for 6 months |
Table 1: Service Requirements OBP has on site refrigeration systems for vaccines preservations and air conditioning systems to keep cold rooms below specific temperatures. OBP also have heat pumps that are used for heating buildings and producing industrial process heat. OBP requires a supplier with expert service knowledge of Carnot refrigeration cycle, capable of evaluating principal work and heat transfers, enhancement of the vapour-compression systems, knowledge of cascade cycles, multistage compression with intercooling and knowledge of Carnot heat pump cycles. Service providers must have demonstrated knowledge of working on the following equipment (please note that this list is not exhaustive): • Refrigerators • Ultra Deep Temperature Freezers • Cold-rooms • Incubators • Air conditioners/ air conditioner replacement if needed under authorisation • Freeze Dryers • Chillers • Provide proof of experience of working on Freeze dryer • Air Handling Unit (EA and VP) . . Onsite Service Required Includes: On-site refrigeration maintenance service level agreement (1 x Refrigeration Technician & 1 x Assistant) for 8 hrs/day x 5 days per week for a period of 6 months. Must include 24/7 emergency standby support with a maximum on-site response time of 1 hour. 100 hours overtime for 1 Refrigeration Technician and 100 hours for 1 Assistant to be included in quote. Refrigeration Technician must be trade-tested with minimum 3 years of industrial refrigeration experience. Must be competent to maintain air conditioners, Chillers, cold rooms, and freezer rooms. Refrigeration Technician must hold a valid SAQCCA Gas Authorised Technician card. CVs of technician and assistant must be included in quotation. Any new refrigeration units (including refrigerators, air conditioners, incubators and cold rooms), gas, materials, consumables, replacement parts, etc required must be supplied at proven retail cost plus a mark-up of maximum 8% (to be included in the SLA) The refrigeration maintenance service team must be equipped with the necessary tools of the trade and must have their own transport to and from site and have sufficient cash flow to purchase materials and spares as required. A standard hardcopy safety file must be allowed for and submitted before any on-site work commences. Additional Requirements to Note: OBP reserves the right to check competency from the potential suppliers using any acceptable engineering measures. All parts, components and services provided will be subjected to not less than 6 months warranty. Performance bonds up to 8% of the whole invoice may be withhold as a guarantee and paid once the 6 months warranty period has elapsed. Agreements meetings will be conducted between supplier and OBP (i.e., legal, finance, procurement, and engineering departments) [ ] |
Table 1: Service Requirements OBP has on site refrigeration systems for vaccines preservations and air conditioning systems to keep cold rooms below specific temperatures. OBP also have heat pumps that are used for heating buildings and producing industrial process heat. OBP requires a supplier with expert service knowledge of Carnot refrigeration cycle, capable of evaluating principal work and heat transfers, enhancement of the vapour-compression systems, knowledge of cascade cycles, multistage compression with intercooling and knowledge of Carnot heat pump cycles. Service providers must have demonstrated knowledge of working on the following equipment (please note that this list is not exhaustive): • Refrigerators • Ultra Deep Temperature Freezers • Cold-rooms • Incubators • Air conditioners/ air conditioner replacement if needed under authorisation • Freeze Dryers • Chillers • Provide proof of experience of working on Freeze dryer • Air Handling Unit (EA and VP) . . Onsite Service Required Includes: On-site refrigeration maintenance service level agreement (1 x Refrigeration Technician & 1 x Assistant) for 8 hrs/day x 5 days per week for a period of 6 months. Must include 24/7 emergency standby support with a maximum on-site response time of 1 hour. 100 hours overtime for 1 Refrigeration Technician and 100 hours for 1 Assistant to be included in quote. Refrigeration Technician must be trade-tested with minimum 3 years of industrial refrigeration experience. Must be competent to maintain air conditioners, Chillers, cold rooms, and freezer rooms. Refrigeration Technician must hold a valid SAQCCA Gas Authorised Technician card. CVs of technician and assistant must be included in quotation. Any new refrigeration units (including refrigerators, air conditioners, incubators and cold rooms), gas, materials, consumables, replacement parts, etc required must be supplied at proven retail cost plus a mark-up of maximum 8% (to be included in the SLA) The refrigeration maintenance service team must be equipped with the necessary tools of the trade and must have their own transport to and from site and have sufficient cash flow to purchase materials and spares as required. A standard hardcopy safety file must be allowed for and submitted before any on-site work commences. Additional Requirements to Note: OBP reserves the right to check competency from the potential suppliers using any acceptable engineering measures. All parts, components and services provided will be subjected to not less than 6 months warranty. Performance bonds up to 8% of the whole invoice may be withhold as a guarantee and paid once the 6 months warranty period has elapsed. Agreements meetings will be conducted between supplier and OBP (i.e., legal, finance, procurement, and engineering departments) [ ] |
2026/01/27 10:00:00 |
No |
2026/02/02 15:00:00 |
| RFQ/OBP132/2026/27 |
Request for Quote |
Refrigeration services at OBP for a period of 6 months |
Maintenance of Refrigeration equipment Chillers AHU Freeze Dryers Cold Room Ultra-low freezers Air Conditioners Incubators HVAC systems not limited to mentioned |
Maintenance of Refrigeration equipment Chillers AHU Freeze Dryers Cold Room Ultra-low freezers Air Conditioners Incubators HVAC systems not limited to mentioned |
2026/08/04 11:00:00 |
No |
2026/08/11 16:00:00 |
| RFQ/OBP455/2024/25 |
Request for Quote |
removal of building rubble in front of the freeze drier |
Remove of building rubble (50 m3) and cart of site to an authorized landfill site |
Remove of building rubble (50 m3) and cart of site to an authorized landfill site |
No |
2024/12/10 15:00:00 |
| RFQ/OBP137/2026/27 |
Request for Quote |
Remove, Supply and Install Cromadex sheet Block R |
Cromadex sheet length 15.5m x 50 m Wide length 14m x 20m wide length 17.5m x 30m Wide bend length 4.6m x 35m wide |
|
2026/08/05 10:00:00 |
No |
2026/08/11 16:00:00 |
| RFQ/OBP005/2025/26 |
Request for Quote |
Renewal of Anti-Virus Software for a period of one (1) Year |
See specifications |
See specifications |
No |
2025/04/17 15:00:00 |
| RFQ/OBP006/2025/26 |
Request for Quote |
Renewal of ManageEngine Licenses |
Quantity Product / Item Code Specification 1 ManageEngine ADManager Plus Professional Edition Software Upgrade and Installation - Subscription Model - 1 Year 1 Domain, 5 x Technicians / Helpdesk Users |
Quantity Product / Item Code Specification 1 ManageEngine ADManager Plus Professional Edition Software Upgrade and Installation - Subscription Model - 1 Year 1 Domain, 5 x Technicians / Helpdesk Users |
No |
2025/04/17 15:00:00 |
| RFQ/OBP216/2026/27 |
Request for Quote |
Renovation of Security Control Room |
SECURITY CONTROL ROOM SCOPE OF WORK Control Room 1. Remove 2x Aluminium windows 1700x850mm 2. Remove 1x Roller door 4000x1500mm 3. Remove 4000mmx 900mm granite top 4. Remove all tiles on the wall 24m² 5. Prepare and paint the security control room with colour chosen by the end-user 6. Prepare and paint the control room ceiling 22m² 7. Repair the lights 8. Close the openings with brick-and-mortar 8m² where roller doors and window removed. 9. Supply and install 18 BTU air-conditioner (Reliable brand) 10. Supply and Install two Bandit doors on a Sally Port (Airlock) • 1x Bandit door with view panel G3 • 1x Bandit door with view G1 • 1x Bandit door with C3 for Escape route 11. Build one line of exterior wall with brick and mortar around the control room for 1000mm (24m²) 12. Bullet Proof stainless steel Tinted window 600x600 with shallow pass-through tray for issuing firearms. Compliance with SANS 1263:2013-part 3 class RC to provide capability against a 7.62 mm x 51mm. 14.Supply and install the floor carpet 23m² Server Room 1. Supply and install 16mm rebar steel bars to reinforce the ceiling 4.2m² (Black painted) 2. Uplift the floor with 200mm (Raised Floor) (3200mmx1200mm) 3. Install Charcoal Security burglar folding gate sliding along the bottom and top tracks fitted with Euro locking mechanism. 4. Supply and install 12BTU (Reliable brand) Security Office 1. Install and Supply drywall for 2500x3000mm wall. 2. Install and Supply drywall for 2500x3000mm wall. 3. Put frosted look on the aluminium glass door. 4. Remove wall tiles for 15m² 5. Prepare and paint the dry wall 45m² 6. Prepare and paint the room ceiling 7. Repair the lights 8. Supply and install aluminium window 12 BTU (Reliable brand) Main door 1. Install Charcoal Security burglar folding gate sliding along the bottom and top tracks fitted with Euro locking system. 2. Supply and Install Euro lock. Main Access 1. Supply and install shade canopy with Chromadek roof sheeting for (shade) and rain 3000mmx5500mm. 2. Supply and install 3x LED 100W spotlight outside the control room. Main Hall 1. Repair 2x sliding doors and install locking mechanism for both sides. 2. Install and supply 2x Charcoal Security burglar folding gate, sliding along the bottom and top tracks fitted with Euro locking system. 3000mmX2100mm 3. Repair the lighting Passage to the bathroom 1. Install and supply 2x Charcoal Security burglar folding gate, sliding along the bottom and top tracks fitted with Euro locking system. 1850mmx2600mm 2. Remove damaged tiles and install. Kitchen 1. Demolish walls and remove two doors. 2. Install kitchen Zinc cupboards with three doors 3. Supply and install the taps 4. Connect the pipes to the sewage line. 5. Install 3x plugs for 3 appliances 6. Repair the lighting Bathroom 1. Remove the male urinary 2. Supply and install locking mechanism Sign installation 1. Security Control room 2. Female and male bathroom 3. Kitchen 4. Control room x2 5. Server room |
SECURITY CONTROL ROOM SCOPE OF WORK Control Room 1. Remove 2x Aluminium windows 1700x850mm 2. Remove 1x Roller door 4000x1500mm 3. Remove 4000mmx 900mm granite top 4. Remove all tiles on the wall 24m² 5. Prepare and paint the security control room with colour chosen by the end-user 6. Prepare and paint the control room ceiling 22m² 7. Repair the lights 8. Close the openings with brick-and-mortar 8m² where roller doors and window removed. 9. Supply and install 18 BTU air-conditioner (Reliable brand) 10. Supply and Install two Bandit doors on a Sally Port (Airlock) • 1x Bandit door with view panel G3 • 1x Bandit door with view G1 • 1x Bandit door with C3 for Escape route 11. Build one line of exterior wall with brick and mortar around the control room for 1000mm (24m²) 12. Bullet Proof stainless steel Tinted window 600x600 with shallow pass-through tray for issuing firearms. Compliance with SANS 1263:2013-part 3 class RC to provide capability against a 7.62 mm x 51mm. 14.Supply and install the floor carpet 23m² Server Room 1. Supply and install 16mm rebar steel bars to reinforce the ceiling 4.2m² (Black painted) 2. Uplift the floor with 200mm (Raised Floor) (3200mmx1200mm) 3. Install Charcoal Security burglar folding gate sliding along the bottom and top tracks fitted with Euro locking mechanism. 4. Supply and install 12BTU (Reliable brand) Security Office 1. Install and Supply drywall for 2500x3000mm wall. 2. Install and Supply drywall for 2500x3000mm wall. 3. Put frosted look on the aluminium glass door. 4. Remove wall tiles for 15m² 5. Prepare and paint the dry wall 45m² 6. Prepare and paint the room ceiling 7. Repair the lights 8. Supply and install aluminium window 12 BTU (Reliable brand) Main door 1. Install Charcoal Security burglar folding gate sliding along the bottom and top tracks fitted with Euro locking system. 2. Supply and Install Euro lock. Main Access 1. Supply and install shade canopy with Chromadek roof sheeting for (shade) and rain 3000mmx5500mm. 2. Supply and install 3x LED 100W spotlight outside the control room. Main Hall 1. Repair 2x sliding doors and install locking mechanism for both sides. 2. Install and supply 2x Charcoal Security burglar folding gate, sliding along the bottom and top tracks fitted with Euro locking system. 3000mmX2100mm 3. Repair the lighting Passage to the bathroom 1. Install and supply 2x Charcoal Security burglar folding gate, sliding along the bottom and top tracks fitted with Euro locking system. 1850mmx2600mm 2. Remove damaged tiles and install. Kitchen 1. Demolish walls and remove two doors. 2. Install kitchen Zinc cupboards with three doors 3. Supply and install the taps 4. Connect the pipes to the sewage line. 5. Install 3x plugs for 3 appliances 6. Repair the lighting Bathroom 1. Remove the male urinary 2. Supply and install locking mechanism Sign installation 1. Security Control room 2. Female and male bathroom 3. Kitchen 4. Control room x2 5. Server room |
2026/09/11 10:00:00 |
No |
2026/09/18 12:00:00 |
| RFQ/OBP355/2025/26 |
Request for Quote |
Renovation of Security Control Room and Supply and Installation of Security Guardrooms |
Renovation of Security Control Room Supply and Installation of Security Guardrooms |
See attached specifications |
2026/02/09 10:30:00 |
No |
2026/02/16 15:00:00 |
| RFQ/OBP504/2024/25 |
Request for Quote |
Renovations of the packaging department |
To renovate the packaging department as follows - Painting of walls - Epoxying of floors using laboratory approved epoxy (Data sheet to be supplied during RFQ stage) - Laboratory approved ISO panels installations - Door installation - Air curtain installation |
To renovate the packaging department as follows - Painting of walls - Epoxying of floors using laboratory approved epoxy (Data sheet to be supplied during RFQ stage) - Laboratory approved ISO panels installations - Door installation - Air curtain installation |
2025/02/10 11:00:00 |
No |
2025/02/24 15:00:00 |
| RFQ/OBP162/2026/27 |
Request for Quote |
Renwal of Yeastar PABX Licences and the maintenane and support of the internal VoIP Solution for 12 months |
The organisation requires a suitably qualified service provider to provide annual licence renewal, software maintenance, technical support and preventative maintenance for its existing enterprise Voice over IP (VoIP) telephone system. The current Yeastar VoIP platform supports approximately 200 registered extensions, departmental hunt groups and a sales call centre. |
|
No |
2026/08/14 16:00:00 |
| RFQ/OBP215/2026/27 |
Request for Quote |
Repairs and service of Incudrive 90Touch. |
Technical /IT Services to enable running of Jumo Software and reset Incudrives functionality. |
|
No |
2026/09/11 16:00:00 |
| RFQ/OBP287/2025/26 |
Request for Quote |
Replacing a collapsed ceiling with a new ceiling |
Request to replace a collapsed roof in the old clinic next to sales department. The following will be required for the replacement of the ceiling: PVC Panel Timber Brandering DAS Cove Cornice Cornice Adhesive Drywall Course thread screw multi fix Nailing Anchor AGS Ika Steel Woodscrew |
|
No |
2025/12/10 15:00:00 |
| RFI/OBP006/2026/27 |
Request for Information |
REQUEST FOR INFORMATION - PILOT FERMENTER FOR BACTERIAL PROPAGATION FOR ONDERSTEPOORT BIOLOGICAL PRODUCT |
The purpose of this Request for Information RFI is to identify and survey experienced market service providers capable of supplying installing commissioning validating and supporting a 40 – 60L Reusable Fermenter As a public entity operating under the PFMA this institution requires high-specification GMP-compliant infrastructure capable of meeting rigorous bioprocess demands up to Biosafety Level 2 and 3 BSL 2 and 3 containment Responses received will be utilized to refine technical specifications understand market availability structure future pricing models and establish realistic delivery timelines prior to formal competitive bidding See attached RFI for the required information |
|
No |
2026/08/10 15:00:00 |
| RFI/OBP007/2026/27 |
Request for Information |
REQUEST FOR INFORMATION - REAL TIME CELL ANALYSIS (RTCA) SYSTEM FOR ONDERSTEPOORT BIOLOGICAL PRODUCT |
The scope of this procurement is to acquire, install, commission, and provide user training for a Real-Time Cell Analysis (RTCA) System capable of continuously monitoring cell growth, proliferation, viability, morphology, migration, invasion, and cytotoxicity in real time using impedance-based, label-free technology. The system shall be suitable for use in virology, vaccine development, and cell culture research and must support continuous, non-invasive monitoring of adherent cell cultures without the need for endpoint assays |
|
No |
2026/08/10 15:00:00 |
| RFP/OBP03/26/HR01 |
Request for Proposal |
REQUEST FOR PROPOSAL: APPOINTMENT OF A SERVICE PROVIDER TO CONDUCT A COMPREHENSIVE ORGANISATIONAL DESIGN PROJECT WHICH I |
APPOINTMENT OF A SERVICE PROVIDER TO CONDUCT A COMPREHENSIVE ORGANISATIONAL DESIGN PROJECT WHICH INCLUDES SKILLS AUDIT, JOB PROFILING, JOB GRADING AND PERFORM A MARKET BENCHMARKING FOR ALL THE POSITIONS AT ONDERSTEPOORT BIOLOGICAL PRODUCTS. OBP03/26/HR01 |
APPOINTMENT OF A SERVICE PROVIDER TO CONDUCT A COMPREHENSIVE ORGANISATIONAL DESIGN PROJECT WHICH INCLUDES SKILLS AUDIT, JOB PROFILING, JOB GRADING AND PERFORM A MARKET BENCHMARKING FOR ALL THE POSITIONS AT ONDERSTEPOORT BIOLOGICAL PRODUCTS. OBP03/26/HR01 |
No |
2026/10/19 13:00:00 |
| RFQ/OBP485/2024/25 |
Request for Quote |
Request for quotation for primers |
The scope of work involves the synthesis and application of specific primers for PCR-based amplification of DNA sequences from Clostridium botulinum types C and D, Clostridium chauvoei, and Clostridium septicum. These primers will be used to amplify genes related to botulinum neurotoxins, CctA, nanA, fliC, alpha toxin, beta channel-forming cytolysin, and sialidase domain-containing proteins. This work forms part of my research focused on developing a combination vaccine for animal pathogens, and includes primer synthesis, PCR amplification, sequencing, and downstream analysis to ensure the correct target sequences are amplified for further testing in vaccine formulation. |
The scope of work involves the synthesis and application of specific primers for PCR-based amplification of DNA sequences from Clostridium botulinum types C and D, Clostridium chauvoei, and Clostridium septicum. These primers will be used to amplify genes related to botulinum neurotoxins, CctA, nanA, fliC, alpha toxin, beta channel-forming cytolysin, and sialidase domain-containing proteins. This work forms part of my research focused on developing a combination vaccine for animal pathogens, and includes primer synthesis, PCR amplification, sequencing, and downstream analysis to ensure the correct target sequences are amplified for further testing in vaccine formulation. |
No |
2025/01/21 15:00:00 |
| RFI/OBP002/2025/26 |
Request for Information |
Request of Information on ISO Paneling walls and roof |
Information |
Information |
2025/08/19 13:00:00 |
No |
2025/08/25 15:00:00 |
| RFQ/OBP548/2024/25 |
Request for Quote |
Request to appoint service provider for the drafting and compilation of the 2024/25 property valuation |
The Valuer is expected to determine and present the following information for each of the properties: 3.1.1 The market-related value -The replacement value -The valuation certificate -The valuation report for 2024/2025 financial statements The Valuer will present the individual draft Valuation reports per property to OBP before finalization at a time as agreed upon between the parties. |
The Valuer is expected to determine and present the following information for each of the properties: 3.1.1 The market-related value -The replacement value -The valuation certificate -The valuation report for 2024/2025 financial statements The Valuer will present the individual draft Valuation reports per property to OBP before finalization at a time as agreed upon between the parties. |
2025/03/24 10:30:00 |
No |
2025/03/31 15:00:00 |
| RFQ/OBP548/2024/25 |
Request for Quote |
Request to appoint service provider for the drafting and compilation of the 2024/25 property valuation |
The Valuer is expected to determine and present the following information for each of the properties: 3.1.1 The market-related value -The replacement value -The valuation certificate -The valuation report for 2024/2025 financial statements The Valuer will present the individual draft Valuation reports per property to OBP before finalization at a time as agreed upon between the parties. |
The Valuer is expected to determine and present the following information for each of the properties: 3.1.1 The market-related value -The replacement value -The valuation certificate -The valuation report for 2024/2025 financial statements The Valuer will present the individual draft Valuation reports per property to OBP before finalization at a time as agreed upon between the parties. |
No |
2025/03/19 15:00:00 |
| RFQ/OBP559/2024/25 |
Request for Quote |
Request to procure software for scanners to be used for asset verification |
The software has to be for unlimited number of users Must provide functionality of use of mobile devices for scanning. Must be able to update, record and report on the asset existence. Be able to capture photos and be able to provide historically data such as the last location captured of the specific asset |
The software has to be for unlimited number of users Must provide functionality of use of mobile devices for scanning. Must be able to update, record and report on the asset existence. Be able to capture photos and be able to provide historically data such as the last location captured of the specific asset |
No |
2025/03/30 15:00:00 |
| RFQ/OBP240/2025/26 |
Request for Quote |
RFQ for anaerogen anaerobic sachets |
10 packs of Thermo Scientific™ Oxoid™ AnaeroGen™ 2.5L Sachet (pack of 10) |
|
No |
2025/11/14 15:00:00 |
| RFQ/OBP344/2025/26 |
Request for Quote |
RfQ for calibration of spectrophotometer |
Calibration of spectrophotometer 200-999nm wavelength range |
|
No |
2026/01/28 15:00:00 |
| RFQ/OBP364/2025/26 |
Request for Quote |
RFQ for CPU for pilot fermenter (S1F1) |
Service provider to supply a new CPU for the pilot fermenter. The Win CC program to run the fermentation processes must be installed on the CPU and the CPU must be installed onto the control unit at OBP |
|
No |
2026/02/12 15:00:00 |
| RFQ/OBP234/2025/26 |
Request for Quote |
RFQ for CPU for S1F1 (pilot fermenter) |
Must be loaded with program for pilot fermenter Must be installed by service provider onto S1F1 panel |
|
No |
2025/11/12 15:00:00 |
| RFQ/OBP279/2025/26 A |
Request for Quote |
RFQ for CPU for S1F1 (pilot fermenter) |
1 CPU for S1F1 Must be loaded with program for pilot fermenter Must be installed by service provider onto S1F1 panel |
1 CPU for S1F1 Must be loaded with program for pilot fermenter Must be installed by service provider onto S1F1 panel |
No |
2025/12/12 15:00:00 |
| RFQ/OBP279/2025/26 |
Request for Quote |
RFQ for CPU for S1F1 (pilot fermenter) |
Must be loaded with program for pilot fermenter Must be installed by service provider onto S1F1 panel |
|
No |
2025/12/07 15:00:00 |
| RFQ/OBP498/2024/25 |
Request for Quote |
RFQ for laboratory safety training |
See attached scope |
See attached scope |
No |
2025/02/10 15:00:00 |
| RFQ/OBP285/2025/26 |
Request for Quote |
RFQ for laboraty consumables |
10 boxes of Microscope slides with specification of Pack Size: PK 50 with a frosted marking area of approx. 20 mm on one sides Dimensions: approx. 76 x 26 mm, 2 of Microscope immersion oil 100ml, 4 of Pipette aid 25ml (red) |
|
No |
2025/12/10 15:00:00 |
| RFQ/OBP495/2024/25 |
Request for Quote |
RFQ for Light box with magnifier for microtiter plates |
See attached scope |
See attached scope |
No |
2025/01/30 15:00:00 |
| RFQ/OBP495/2024/25 |
Request for Quote |
RFQ for Light box with magnifier for microtiter plates |
See attached scope |
See attached scope |
No |
2025/02/25 15:00:00 |
| RFQ/OBP495/2024/25 |
Request for Quote |
RFQ for Light box with magnifier for microtiter plates |
See attached scope |
See attached scope |
No |
2025/02/10 15:00:00 |
| RFQ/OBP541/2024/25 |
Request for Quote |
RFQ for mini filters |
Pore size 0.2 µm Test pressure 0.7 /10 bar/psi Maximum diffusion 2 ml/min (approximately 125mm length) Minimum bubble point 10/14.5 bar/psi filter length 120mm *Please include picture of filter |
Pore size 0.2 µm Test pressure 0.7 /10 bar/psi Maximum diffusion 2 ml/min (approximately 125mm length) Minimum bubble point 10/14.5 bar/psi filter length 120mm *Please include picture of filter |
No |
2025/03/09 15:00:00 |
| RFQ/OBP545/2024/25 |
Request for Quote |
RFQ for office chairs |
• Black mesh back • PP height adjustable T-arms • Chrome base • Padded fabric seat • Tension adjuster • EU certified components • Mechanism: swivel and tilt • Memory foam • BIFMA Level 3 gas lift • Weight capacity 100kg |
• Black mesh back • PP height adjustable T-arms • Chrome base • Padded fabric seat • Tension adjuster • EU certified components • Mechanism: swivel and tilt • Memory foam • BIFMA Level 3 gas lift • Weight capacity 100kg |
No |
2025/03/09 15:00:00 |
| RFQ/OBP133/2025/26 |
Request for Quote |
RFQ for Operations Management training |
BV personnel- 6 people (2/3 day course) On site at OBP Certificate of competence must be issued after training Course must cover the following: The role of operations in an organisation Develop operational strategies for a department/ unit Develop and implement an operation plan for department/ unit Planning, control and capacity planning techniques Stock management principles Monitor measure and evaluate the achievement of goals and objectives |
BV personnel- 6 people (2/3 day course) On site at OBP Certificate of competence must be issued after training Course must cover the following: The role of operations in an organisation Develop operational strategies for a department/ unit Develop and implement an operation plan for department/ unit Planning, control and capacity planning techniques Stock management principles Monitor measure and evaluate the achievement of goals and objectives |
No |
2025/08/31 15:00:00 |
| RFQ/OBP095/2026/27 |
Request for Quote |
RFQ for packed cell volume tubes |
Quantity 2 Product/Item Code Product/Item Code Specification Graduated PCV tubes without caps Sterilized by radiation Free from DNA/RNA, DNase/RNase Free from pyrogens 250/case Used to determine packed cell volume |
|
No |
2026/07/07 16:00:00 |
| RFQ/OBP457/2025/26 |
Request for Quote |
RFQ for packed cell volume tubes |
Supply of PCV tubes as per specifications |
|
No |
2026/03/27 20:52:38 |
| RFQ/OBP047/2026/27 |
Request for Quote |
RFQ for packed cell volume tubes |
Graduated PCV tubes without caps sterilized by radiation free from DNA/RNA, DNase/RNase free from pyrogens Pack of 50 Used to determine packed cell volume |
|
No |
2026/06/01 16:00:00 |
| RFQ/OBP496/2024/25 |
Request for Quote |
RFQ for procurement of 50 ml polypropylene conical tubes |
The tubes must be sterile |
The tubes must be sterile |
No |
2025/01/30 15:00:00 |
| RFQ/OBP544/2024/25 |
Request for Quote |
RFQ for production fermenter gaskets |
Gaskets for production fermenters NW20 DIN gasket perbunan NW40 DIN gasket perbunan NW65 DIN gasket perbunan |
Gaskets for production fermenters NW20 DIN gasket perbunan NW40 DIN gasket perbunan NW65 DIN gasket perbunan |
No |
2025/03/09 15:00:00 |
| RFQ/OBP266/2025/26 |
Request for Quote |
RFQ for repairs to mechanical seal |
Seal PrtKt : 45mm Type 587/ D14041 Drawing D/14041D 0450/587/ RK/D14041 |
|
No |
2025/12/02 15:00:00 |
| RFQ/OBP425/2025/26 |
Request for Quote |
RFQ for sample tubes (centrifuge tubes) |
Polyproplyene, sterile |
Polyproplyene, sterile |
No |
2026/03/14 16:00:00 |
| RFQ/OBP462/2024/25 |
Request for Quote |
RFQ for screen printing of Anaplasmosis Vaccine Bittles |
See attached specifications |
See attached specifications |
No |
2024/12/10 15:00:00 |