391 opportunities

Page 1 of 8
Bid Number Bid Type Name Description Specifications Sight Briefing Date Closing Date
RFQ/OBP543/2024/25 Request for Quote service of transformers and mini-sub 1 1000kVA Transformer Serial No's 0/5870/1/1 & 0/5870/1/2 2 11000/400V MAIN Clean Transformer Service Seal leaks Change oil 2 500kVA Transformer Serial No. 41992 1 11000/400V BOILER Clean Transformer Service Seal leaks Change oil 3 100kVA Mini Substation Serial No. M7469/1 1 11000/400V COLDROOM Clean Transformer Take Oil Sample, test for kV, Moisture, DGA, PCB and Furanics Attend to Minor Leaks (To Report ONLY on Major) Take After Sample for Analysis (kV & Moisture) repaint with original Colour Service and Test Hawker Siddeley Tiger Switch 4 630kVA Mini Substation Serial No. M6103 1 1 11000/400V EA Clean Transformer Attend to Minor Leaks (To Report ONLY on Major) Change oil repaint with original Colour Service and Test Hawker Siddeley Tiger Switch, including oil Change 5 11kV Substation SWITCH GEAR MAIN & BOILER 2 Clean Panels and Substation Room Service and Test Actom SBV4 Breakers Service includes : Contact Resistance test, AC Pressure test, cleaning, Lubrication and inspection of operating Mechanism. Breaker Speed test and Secondary Injection Testing. Replace indicator lights (change MV fuses if necessary) 6 Service and test Battery Tripping Units, check charge Rate (change battery) 2 1 1000kVA Transformer Serial No's 0/5870/1/1 & 0/5870/1/2 2 11000/400V MAIN Clean Transformer Service Seal leaks Change oil 2 500kVA Transformer Serial No. 41992 1 11000/400V BOILER Clean Transformer Service Seal leaks Change oil 3 100kVA Mini Substation Serial No. M7469/1 1 11000/400V COLDROOM Clean Transformer Take Oil Sample, test for kV, Moisture, DGA, PCB and Furanics Attend to Minor Leaks (To Report ONLY on Major) Take After Sample for Analysis (kV & Moisture) repaint with original Colour Service and Test Hawker Siddeley Tiger Switch 4 630kVA Mini Substation Serial No. M6103 1 1 11000/400V EA Clean Transformer Attend to Minor Leaks (To Report ONLY on Major) Change oil repaint with original Colour Service and Test Hawker Siddeley Tiger Switch, including oil Change 5 11kV Substation SWITCH GEAR MAIN & BOILER 2 Clean Panels and Substation Room Service and Test Actom SBV4 Breakers Service includes : Contact Resistance test, AC Pressure test, cleaning, Lubrication and inspection of operating Mechanism. Breaker Speed test and Secondary Injection Testing. Replace indicator lights (change MV fuses if necessary) 6 Service and test Battery Tripping Units, check charge Rate (change battery) 2 2025/03/10 11:00:00 No 2025/03/16 15:00:00
RFQ/OBP431/2024/25 Request for Quote (PMI-RMP) Risk Management Professional Training Training Provider –Project Management Institute (PMI) Authorized Partner Location –Can be at the supplier’s Training centre or online. Course Duration: Approved duration (Service provider to advise) Training site: Training provider to advise. Learning Materials Include study material & copy of presentation. Training Mode: Class based with case studies (Examples related to the respective functions/training material) Competency certificate: PMI Risk Management Professional (PMI-RMP)® Certification exam required for demonstration of competency. Learning Outcome: Learners should be able to initiate, lead and complete the risk, time, human, cost and quality elements of complex and various projects. Exam and registration fee to be included in the cost Training Provider –Project Management Institute (PMI) Authorized Partner Location –Can be at the supplier’s Training centre or online. Course Duration: Approved duration (Service provider to advise) Training site: Training provider to advise. Learning Materials Include study material & copy of presentation. Training Mode: Class based with case studies (Examples related to the respective functions/training material) Competency certificate: PMI Risk Management Professional (PMI-RMP)® Certification exam required for demonstration of competency. Learning Outcome: Learners should be able to initiate, lead and complete the risk, time, human, cost and quality elements of complex and various projects. Exam and registration fee to be included in the cost No 2024/12/01 15:00:00
RFQ/OBP345/2024/25 Request for Quote (PMI-RMP) Risk Management Professional Training Location –Can be at the supplier’s Training centre or online. Course Duration: Approved duration (Service provider to advise) Training site: Training provider to advise. Learning Materials Include study material & copy of presentation. Training Mode: Class based with case studies (Examples related to the respective functions/training material) Competency certificate: PMI Scheduling Professional (PMI-SP) ® Certification exam required for demonstration of competency. Learning Outcome: Learners should be able to initiate, lead and complete the risk, time, human, cost and quality elements of complex and various projects. Exam and registration fee to be included in the cost Location –Can be at the supplier’s Training centre or online. Course Duration: Approved duration (Service provider to advise) Training site: Training provider to advise. Learning Materials Include study material & copy of presentation. Training Mode: Class based with case studies (Examples related to the respective functions/training material) Competency certificate: PMI Scheduling Professional (PMI-SP) ® Certification exam required for demonstration of competency. Learning Outcome: Learners should be able to initiate, lead and complete the risk, time, human, cost and quality elements of complex and various projects. Exam and registration fee to be included in the cost No 2024/10/03 15:00:00
RFQ/OBP439/2024/25 Request for Quote 1 ML explorer multichannel pipette tips They are ideal for repetitive tasks in experiments, such as performing assays, serial dilutions, or sample preparation in molecular biology, drug discovery, and diagnostic labs. They are ideal for repetitive tasks in experiments, such as performing assays, serial dilutions, or sample preparation in molecular biology, drug discovery, and diagnostic labs. No 2025/03/23 15:00:00
RFQ/OBP439/2024/25 Request for Quote 1 ML explorer multichannel pipette tips Procurement Description:They are ideal for repetitive tasks in experiments, such as performing assays, serial dilutions, or sample preparation in molecular biology, drug discovery, and diagnostic labs. Procurement Description:They are ideal for repetitive tasks in experiments, such as performing assays, serial dilutions, or sample preparation in molecular biology, drug discovery, and diagnostic labs. No 2024/12/04 15:00:00
RFQ/OBP024/2025/26 Request for Quote 10 ML Sterile Plastic Bottles for Diluent See attached specifications See attached specifications No 2025/05/02 15:00:00
RFQ/OBP026/2025/26 Request for Quote 100 ML Sterile Plastic Bottles for Diluent See attached specifications See attached specifications No 2025/05/02 15:00:00
RFQ /OBP523/2024/25 Request for Quote 12 cell 219A/H Forklift battery See specifications See specifications No 2025/02/25 15:00:00
RFQ/OBP057/2025/26 Request for Quote 12 cell 219A/H Forklift battery See attached specifications See attached specifications No 2025/06/15 15:00:00
RFQ/OBP429/2024/25 Request for Quote 12V 45A/H BATTERIES Current batteries have reached shelf life. Current batteries have reached shelf life. No 2024/12/01 15:00:00
RFQ/OBP503/2024/25 Request for Quote 13 Raw Material personnel to be trained on ISO 17025 accreditation. The Raw Material team will be undergoing training on ISO 17025 accreditation. This training will equip the personnel with the necessary knowledge and skills to understand and implement the standard effectively within our processes. The Raw Material team will be undergoing training on ISO 17025 accreditation. This training will equip the personnel with the necessary knowledge and skills to understand and implement the standard effectively within our processes. No 2025/02/19 15:00:00
RFQ/OBP010/2025/26 Request for Quote 15RFQ lab consumables 5 packs Cryovials (50 per pack) Type: Internal threading, freestanding Cap type: Internal screwcap with silicone seal, natural Volume: 2.0 ml Graduation marking: 1.0 ml and 1.8ml Material: Polypropylene Packaging: Packed in resealable safety lock bags Sterility: Sterile (gamma irradiated) DNase free and RNase free Endotoxin free Label detail: white marking area Temperature ranges from -196°C to + 121°C 15 packs Pipette tips (100 per packs) Make: Polypropylene, Volume: 0.5 – 5 ml with maximum volume of 5 ml Non-sterile DNase free RNase free Barrier: no Disposable Endotoxin free Filter: no Graduation: no Temperature ranges from -190°C - 140°C 10 bags Falcon Conical Centrifuge tubes (25 tubes/ bag) Cap type: Polyethylene flat top screw cap Volume: 15ml Bottom style: conical Graduation marking: 2-14ml Material: Clear Polypropylene Packaging: Packed in resealable safety lock bags Sterility: Sterile (gamma irradiated) DNase free and RNase free Noncytotoxic and nonpyrogenic Label detail: white marking area Disposable 3000 x g RCF 5 packs Cryovials (50 per pack) Type: Internal threading, freestanding Cap type: Internal screwcap with silicone seal, natural Volume: 2.0 ml Graduation marking: 1.0 ml and 1.8ml Material: Polypropylene Packaging: Packed in resealable safety lock bags Sterility: Sterile (gamma irradiated) DNase free and RNase free Endotoxin free Label detail: white marking area Temperature ranges from -196°C to + 121°C 15 packs Pipette tips (100 per packs) Make: Polypropylene, Volume: 0.5 – 5 ml with maximum volume of 5 ml Non-sterile DNase free RNase free Barrier: no Disposable Endotoxin free Filter: no Graduation: no Temperature ranges from -190°C - 140°C 10 bags Falcon Conical Centrifuge tubes (25 tubes/ bag) Cap type: Polyethylene flat top screw cap Volume: 15ml Bottom style: conical Graduation marking: 2-14ml Material: Clear Polypropylene Packaging: Packed in resealable safety lock bags Sterility: Sterile (gamma irradiated) DNase free and RNase free Noncytotoxic and nonpyrogenic Label detail: white marking area Disposable 3000 x g RCF No 2025/04/15 15:00:00
OBP435/2024/25 Request for Quote 2 L Flat bottom Boiling flasks Flat bottom Boiling flasks Borosilicate or pyrex glass Heat up to 134 oC and chemical resistance 50 x 2L flat bottom boiling flasks Approx neck OD: 42mm Colour: Clear Flat bottom Boiling flasks Borosilicate or pyrex glass Heat up to 134 oC and chemical resistance 50 x 2L flat bottom boiling flasks Approx neck OD: 42mm Colour: Clear No 2024/12/01 15:00:00
RFQ/OBP451/2024/25 Request for Quote 2 x 10” 316L SANITARY HOUSING CODE 3 WITH BRACKET/LEGS PRODUCT NAME: 10” 316L SANITARY HOUSING CODE 3 WITH BRACKET/LEGS Materials of Construction 316L Length Less than 600mm Filter size to fit 10” code 3 Inlet/Outlet 1 ½”” Tri-clover Max Operating Pressure 10 bars Max.Operating Temperature 150°C Seal Material EPDM, Silicone or Viton Closure Type Quick release Clamp and Tee bar Bracket /legs for standing Required Surface finish 0.8μm Ra mechanically polished inside and out + final Electropolish Vent connections Required Filter adaptor type Code 7 Drawing requirement Required Availability of spares Required Unique serial number Required Documentation pack for traceability Required PRODUCT NAME: 10” 316L SANITARY HOUSING CODE 3 WITH BRACKET/LEGS Materials of Construction 316L Length Less than 600mm Filter size to fit 10” code 3 Inlet/Outlet 1 ½”” Tri-clover Max Operating Pressure 10 bars Max.Operating Temperature 150°C Seal Material EPDM, Silicone or Viton Closure Type Quick release Clamp and Tee bar Bracket /legs for standing Required Surface finish 0.8μm Ra mechanically polished inside and out + final Electropolish Vent connections Required Filter adaptor type Code 7 Drawing requirement Required Availability of spares Required Unique serial number Required Documentation pack for traceability Required No 2024/12/04 15:00:00
RFQ/OBP436/2024/25 Request for Quote 250ml Erlenmeyer flask Erlenmeyer flask Narrow neck 250ml Borosilicate or pyrex glass Heat up to 134 oC and chemical resistance Erlenmeyer flask Narrow neck 250ml Borosilicate or pyrex glass Heat up to 134 oC and chemical resistance No 2024/12/01 15:00:00
RFQ/OBP020/2025/26 Request for Quote 3 x Maximum and minimum temperature logger • Portable • Digital display • Cable length: ±1 meter • • Calibration certificates are compulsory. • Temperature: ± -40°C to ± 70°C • Portable • Digital display • Cable length: ±1 meter • • Calibration certificates are compulsory. • Temperature: ± -40°C to ± 70°C No 2025/04/24 15:00:00
RFQ/OBP042/2025/26 Request for Quote 300kg Topside / lean mince not exceeding 5% fat 300 kg topside / lean mince not exceeding 5% fat 300 kg topside / lean mince not exceeding 5% fat No 2025/05/25 15:00:00
RFQ/OBP042/2025/26 A Request for Quote 300kg Topside / lean mince not exceeding 5% fat 300 kg topside / lean mince not exceeding 5% fat 300 kg topside / lean mince not exceeding 5% fat No 2025/06/23 15:00:00
RFQ/OBP023/2025/26 Request for Quote 5 ML Sterile Plastic Bottles for Diluent See attached specifications See attached specifications No 2025/05/02 15:00:00
RFQ/OBP426/2024/25 Request for Quote 50 ml individually wrapped combitips They are especially useful when dispensing the same volume multiple times, as they reduce manual pipetting steps, enhancing efficiency and accuracy while minimizing contamination risk. They are especially useful when dispensing the same volume multiple times, as they reduce manual pipetting steps, enhancing efficiency and accuracy while minimizing contamination risk. No 2025/03/30 15:00:00
RFQ/OBP426/2024/25 Request for Quote 50 ml individually wrapped combitips They are especially useful when dispensing the same volume multiple times, as they reduce manual pipetting steps, enhancing efficiency and accuracy while minimizing contamination risk. They are especially useful when dispensing the same volume multiple times, as they reduce manual pipetting steps, enhancing efficiency and accuracy while minimizing contamination risk. No 2024/12/01 15:00:00
RFQ/OBP025/2025/26 Request for Quote 50 ML Sterile Plastic Bottles for Diluent See attached specifications See attached specifications No 2025/05/02 15:00:00
RFQ/OBP491/2024/25 Request for Quote 50 x 50L TANK VENT 0.2MIC STERILE PFTE MEMBANE PRODUCT NAME: 50L TANK VENT 0.2MIC STERILE PFTE MEMBANE Type of material Final filter Membrane: PTFE Fleece material Polypropylene -In-Line Steam sterilizable & autoclavable) Pore Size 0.2 μm Max. Allowable Operating pressure 5.5 bar (liquid) at 20 Deg C 4.1 bar (gas)bar at 20 Deg C Max. Allowable Back Pressure 2.7 bar | 29 psi at 20°C End Caps: Polypropylene Polypropylene Core material: Polypropylene Capsule/Cartridge Housing: Polypropylene Polypropylene O-Ring: Silicone (other materials on request) N/A Maximum length – end to end 140mm Validation Certified to comply with DIN/ISO 9001 Standards Each individual element is tested for integrity by Bubble Point and Diffusion test/ and or Water Intrusion Test – Fully validated as sterilizing grade filters according to ASTM current F-838 guidelines – Designed, developed and manufactured in accordance with an ISO 9001 certified Quality Management System – Meet or exceed the requirements for WFI quality standards set by the current USP Non pyrogenic according to USP Bacterial Endotoxins – USP Plastic Class VI Test – Non fiber releasing according to 21 CFR Filter adaptor type ½” BSPP Male Appearance Small white Capsule filter with TC connections inlet/outlet and vent/drain valves on unsterile side PRODUCT NAME: 50L TANK VENT 0.2MIC STERILE PFTE MEMBANE Type of material Final filter Membrane: PTFE Fleece material Polypropylene -In-Line Steam sterilizable & autoclavable) Pore Size 0.2 μm Max. Allowable Operating pressure 5.5 bar (liquid) at 20 Deg C 4.1 bar (gas)bar at 20 Deg C Max. Allowable Back Pressure 2.7 bar | 29 psi at 20°C End Caps: Polypropylene Polypropylene Core material: Polypropylene Capsule/Cartridge Housing: Polypropylene Polypropylene O-Ring: Silicone (other materials on request) N/A Maximum length – end to end 140mm Validation Certified to comply with DIN/ISO 9001 Standards Each individual element is tested for integrity by Bubble Point and Diffusion test/ and or Water Intrusion Test – Fully validated as sterilizing grade filters according to ASTM current F-838 guidelines – Designed, developed and manufactured in accordance with an ISO 9001 certified Quality Management System – Meet or exceed the requirements for WFI quality standards set by the current USP Non pyrogenic according to USP Bacterial Endotoxins – USP Plastic Class VI Test – Non fiber releasing according to 21 CFR Filter adaptor type ½” BSPP Male Appearance Small white Capsule filter with TC connections inlet/outlet and vent/drain valves on unsterile side No 2025/01/26 15:00:00
RFQ/OBP355/2024/25 Request for Quote 5ml Vaccine bottles Refer to specification's Refer to specification's No 2024/10/07 15:00:00
RFQ/OBP368/2024/25 Request for Quote 5ML Vaccine bottles See specifications See specifications No 2024/10/17 15:00:00
RFQ/OBP453/2024/25 Request for Quote A TURNKEY PROCESS OF HEADHUNTING AND PLACEMENT OF AN EXPERT TO ADVISE ON COSTING OF INVENTORY AND A SUITABLE ERP SYSTEM See attached specifications See attached specifications No 2024/12/11 15:00:00
RFQ/OPB028/2025/26 Request for Quote Adhesive Silver Aluminium barcode tags for marking of assets Size should be not more than 44mm X 15mm Material: 0.5 mm thick anodized aluminium Font Colour; Black Numbering range: 11000 to 20000 Can be read by a scanner Superior resistance to chemicals, abrasion, solvents, extreme temperatures and UV label should be covered with a clear coating to prevent scratches damaging the printed image Size should be not more than 44mm X 15mm Material: 0.5 mm thick anodized aluminium Font Colour; Black Numbering range: 11000 to 20000 Can be read by a scanner Superior resistance to chemicals, abrasion, solvents, extreme temperatures and UV label should be covered with a clear coating to prevent scratches damaging the printed image No 2025/05/06 15:00:00
RFQ/OBP430/2024/25 Request for Quote Advance Project Management Training Training Provider –Project Management Institute (PMI) Authorized Partner Location –Can be at the supplier’s Training centre. Course Duration: Approved duration (Service provider to advise) Training site: Training provider to advise. Learning Materials Include study material & copy of presentation. Training Mode: Class based with case studies (Examples related to the respective functions/training material) Competency certificate: Project Management Professional (PMP)® PMI Project Management Professional (PMI-PMP) Certification exam required for demonstration of competency. Learning Outcome: Learners should be able to initiate, lead and complete the risk, time, human, cost and quality elements of complex and various projects. Training Provider –Project Management Institute (PMI) Authorized Partner Location –Can be at the supplier’s Training centre. Course Duration: Approved duration (Service provider to advise) Training site: Training provider to advise. Learning Materials Include study material & copy of presentation. Training Mode: Class based with case studies (Examples related to the respective functions/training material) Competency certificate: Project Management Professional (PMP)® PMI Project Management Professional (PMI-PMP) Certification exam required for demonstration of competency. Learning Outcome: Learners should be able to initiate, lead and complete the risk, time, human, cost and quality elements of complex and various projects. No 2024/12/01 15:00:00
RFQ/OBP065/2025/26 Request for Quote Advanced Ms Excel training - 4 delegates (2 departments) • Course manual • Exercises • Class Test • Certificate • Course manual • Exercises • Class Test • Certificate No 2025/06/23 15:00:00
RFQ/OBP339/2024/25 Request for Quote Advanced Training In Biopharmaceutical Technology Transfer Programme should include: 1. The landscape of TT 2. Facility and equipment fir for TT 3. Validation strategies and de-risking techniques 4. Regulatory considerations for TT 5. Operational Excellence in TT 6. Risk Management and Change control 7. Interdisciplinary collaboration and communication 8. Continuous improvement 9. Best practices and future trends Learning Outcome (Learners/Candidates should be able to): 1. Facilitate transfer of processes, technologies and knowledge between R7D and manufacturing site. 2. Understand best practices in the biopharmaceutical setting TT process 3. Have insights into the regulation regarding the biopharmaceutical setting TT process 4. Learn challenge management and control strategies to ensure successful TT projects. 5. Design criteria for measuring success between Sending and Receiving Units 6. Technology Transfer Process Flow and documentation 7. Technology Transfer documentation review Programme should include: 1. The landscape of TT 2. Facility and equipment fir for TT 3. Validation strategies and de-risking techniques 4. Regulatory considerations for TT 5. Operational Excellence in TT 6. Risk Management and Change control 7. Interdisciplinary collaboration and communication 8. Continuous improvement 9. Best practices and future trends Learning Outcome (Learners/Candidates should be able to): 1. Facilitate transfer of processes, technologies and knowledge between R7D and manufacturing site. 2. Understand best practices in the biopharmaceutical setting TT process 3. Have insights into the regulation regarding the biopharmaceutical setting TT process 4. Learn challenge management and control strategies to ensure successful TT projects. 5. Design criteria for measuring success between Sending and Receiving Units 6. Technology Transfer Process Flow and documentation 7. Technology Transfer documentation review No 2024/10/01 15:00:00
RFQ/OBP338/2024/25 Request for Quote Advanced Validation Training Training details Groups Dynamics – Quality Assurance Validation team. Course Duration: 5 days. Learning Materials Include study material /copy of presentation. Training Mode: Onsite / Offsite class based. Skills, knowledge and reflective learning outcomes 1. Application of V-model 2. Current Pharmaceutical industry practice URS design 3. CSV design and application 4. Current Process validation design and application 5. Analytical Instrument Qualifications 6. Cleaning validation and Process Validation lifecycle approach 7. Current pharmaceutical Utility systems 8. Implementation of CCS Strategy Temperature Mapping Training details Groups Dynamics – Quality Assurance Validation team. Course Duration: 5 days. Learning Materials Include study material /copy of presentation. Training Mode: Onsite / Offsite class based. Skills, knowledge and reflective learning outcomes 1. Application of V-model 2. Current Pharmaceutical industry practice URS design 3. CSV design and application 4. Current Process validation design and application 5. Analytical Instrument Qualifications 6. Cleaning validation and Process Validation lifecycle approach 7. Current pharmaceutical Utility systems 8. Implementation of CCS Strategy Temperature Mapping No 2024/10/01 15:00:00
RFQ/OBP055/2025/26 Request for Quote Agile Project Management Training • Digital accredited course material • Sample questions and Case Studies • Sample exam paper, answer and rationale sets • Examination fees • Digital accredited course material • Sample questions and Case Studies • Sample exam paper, answer and rationale sets • Examination fees No 2025/06/15 15:00:00
RFQ/OBP369/2024/25 Request for Quote AHS 1 Labels 2063/1 see specifications see specifications No 2024/10/17 15:00:00
RFQ/OBP370/2024/25 Request for Quote AHS 2 Labels 2063/2 See specifications See specifications No 2024/10/17 15:00:00
RFQ/OBP372/2024/25 Request for Quote AHS Carton 2063/12 see specification see specification No 2024/10/17 15:00:00
RFQ/OBP371/2024/25 Request for Quote AHS carton 2063/2 See specifications See specifications No 2024/10/17 15:00:00
RFQ/OBP519/2024/25 Request for Quote All in One Computer X 1 See attached specifications See attached specifications No 2025/02/25 15:00:00
RFQ/OBP013/2025/26 Request for Quote Animal Blood testing Test Animal Blood samples for different disease susceptibilities Test Animal Blood samples for different disease susceptibilities No 2025/04/15 15:00:00
RFQ/OBP075/2025/26 Request for Quote Animal Ethics Committee-Training (Regulatory Compliance requirement) Offer Regulatory Compliance Requirement to 10 OBP Animal Ethics Committee members Offer Regulatory Compliance Requirement to 10 OBP Animal Ethics Committee members No 2025/07/03 15:00:00
RFQ/OBP/530/2024/25 Request for Quote Animal Pellets Sourcing Semi-Complete Ruminant and Riders Pellets Sourcing Semi-Complete Ruminant and Riders Pellets No 2025/03/05 15:00:00
RFQ/OBP445/2024/25 Request for Quote Animal Pellets See attached specifications See attached specifications No 2024/12/01 15:00:00
RFQ/OBP074/2025/26 Request for Quote Animal scientist-Training for scientists in Animal research ethics (Regulatory Compliance requirement) Animal scientist-Training for scientists in Animal research ethics for 15 people Animal scientist-Training for scientists in Animal research ethics for 15 people No 2025/07/03 15:00:00
RFQ/OBP473/2024/25 Request for Quote Annual Service and calibration of the Millrock Freeze dryer Service and calibration Service and calibration No 2025/01/16 15:00:00
RFQ/OBP552/2024/25 Request for Quote Annual service for the Sarto Flow Advance TFF system The Sarto Flow Advance TFF system, supplied by Sartorius in 2014, has never been serviced since its purchase. The Sarto Flow Advance TFF system, supplied by Sartorius in 2014, has never been serviced since its purchase. No 2025/03/17 15:00:00
RFQ/OBP552/2024/25 Request for Quote Annual service for the Sarto Flow Advance TFF system The Sarto Flow Advance TFF system, supplied by Sartorius in 2014, has never been serviced since its purchase. The Sarto Flow Advance TFF system, supplied by Sartorius in 2014, has never been serviced since its purchase. No 2025/03/17 15:00:00
OBP478/2024/25 Request for Quote Annual Strategic Risk Assessment workshop Scope of work The scope of work is the following: Conduct risk assessment on the annual performance plan and Corporate plan. · Design the strategic risk assessment workshop which include research and preparation of pre- workshop packs, pre- workshop sessions. · The estimated number of the workshop participants is +- 35 for the Exco and Management workshop and +/- 16 for the Exco and Board workshop. · Facilitate identification of risks, risk owner allocation, analysis, and prioritization in alignment to 2023/24/25 Corporate plan. · Facilitate and challenge discussions to ensure precise identification and understanding of risks by all concerned. · Facilitate identification of control improvement plan(s) with measures, action owners and timelines. Present and submit a Strategic Risk Assessment report and Risk profile from the engagement and workshops. Facilitator experience and professional body registration The facilitator should have done Risk assessment facilitation experience in process manufacturing business environment. · A list of relevant references should be provided on the risk assessment workshop facilitation previously conducted he The facilitator should attach a proof of certification with a recognized Risk Management professional body such as IRMSA or PECB. Scope of work The scope of work is the following: Conduct risk assessment on the annual performance plan and Corporate plan. · Design the strategic risk assessment workshop which include research and preparation of pre- workshop packs, pre- workshop sessions. · The estimated number of the workshop participants is +- 35 for the Exco and Management workshop and +/- 16 for the Exco and Board workshop. · Facilitate identification of risks, risk owner allocation, analysis, and prioritization in alignment to 2023/24/25 Corporate plan. · Facilitate and challenge discussions to ensure precise identification and understanding of risks by all concerned. · Facilitate identification of control improvement plan(s) with measures, action owners and timelines. Present and submit a Strategic Risk Assessment report and Risk profile from the engagement and workshops. Facilitator experience and professional body registration The facilitator should have done Risk assessment facilitation experience in process manufacturing business environment. · A list of relevant references should be provided on the risk assessment workshop facilitation previously conducted he The facilitator should attach a proof of certification with a recognized Risk Management professional body such as IRMSA or PECB. No 2025/01/09 16:00:00
RFQ/OBP475/2024/25 Request for Quote Appoint a panel for screen printing of bottles for blood vaccines for a period of 36 months See specifications See specifications No 2025/01/23 15:00:00
RFQ/OBP053/2025/26 Request for Quote Appoint an occupational therapist to do Functional Capacity Evaluation (FCE) & Reports • Functional Capacity Evaluation (FCE) & Reports • Functional Capacity Evaluation (FCE) & Reports No 2025/06/03 15:00:00
RFQ/OBP403/2024/25 Request for Quote Appointing services provider for taxation service for 24 months See attached specifications See attached specifications No 2024/11/24 15:00:00
RFQ/OBP107/2025/26 Request for Quote Appointment of a service provider to provide Refrigeration Service for a period of 6 months Table 1: Service Requirements OBP has on site refrigeration systems for vaccines preservations and air conditioning systems to keep cold rooms below specific temperatures. OBP also have heat pumps that are used for heating buildings and producing industrial process heat. OBP requires a supplier with expert service knowledge of Carnot refrigeration cycle, capable of evaluating principal work and heat transfers, enhancement of the vapour-compression systems, knowledge of cascade cycles, multistage compression with intercooling and knowledge of Carnot heat pump cycles. Service providers must have demonstrated knowledge of working on the following equipment (please note that this list is not exhaustive): • Refrigerators • Ultra Deep Temperature Freezers • Cold-rooms • Incubators • Air conditioners/ air conditioner replacement if needed under authorisation • Freeze Dryers • Chillers • Provide proof of experience of working on Freeze dryer • Air Handling Unit (EA and VP) . . Onsite Service Required Includes: On-site refrigeration maintenance service level agreement (1 x Refrigeration Technician & 1 x Assistant) for 8 hrs/day x 5 days per week for a period of 6 months. Must include 24/7 emergency standby support with a maximum on-site response time of 1 hour. 100 hours overtime for 1 Refrigeration Technician and 100 hours for 1 Assistant to be included in quote. Refrigeration Technician must be trade-tested with minimum 3 years of industrial refrigeration experience. Must be competent to maintain air conditioners, Chillers, cold rooms, and freezer rooms. Refrigeration Technician must hold a valid SAQCCA Gas Authorised Technician card. CVs of technician and assistant must be included in quotation. Any new refrigeration units (including refrigerators, air conditioners, incubators and cold rooms), gas, materials, consumables, replacement parts, etc required must be supplied at proven retail cost plus a mark-up of maximum 8% (to be included in the SLA) The refrigeration maintenance service team must be equipped with the necessary tools of the trade and must have their own transport to and from site and have sufficient cash flow to purchase materials and spares as required. A standard hardcopy safety file must be allowed for and submitted before any on-site work commences. Additional Requirements to Note: OBP reserves the right to check competency from the potential suppliers using any acceptable engineering measures. All parts, components and services provided will be subjected to not less than 6 months warranty. Performance bonds up to 8% of the whole invoice may be withhold as a guarantee and paid once the 6 months warranty period has elapsed. Agreements meetings will be conducted between supplier and OBP (i.e., legal, finance, procurement, and engineering departments) [ ] Table 1: Service Requirements OBP has on site refrigeration systems for vaccines preservations and air conditioning systems to keep cold rooms below specific temperatures. OBP also have heat pumps that are used for heating buildings and producing industrial process heat. OBP requires a supplier with expert service knowledge of Carnot refrigeration cycle, capable of evaluating principal work and heat transfers, enhancement of the vapour-compression systems, knowledge of cascade cycles, multistage compression with intercooling and knowledge of Carnot heat pump cycles. Service providers must have demonstrated knowledge of working on the following equipment (please note that this list is not exhaustive): • Refrigerators • Ultra Deep Temperature Freezers • Cold-rooms • Incubators • Air conditioners/ air conditioner replacement if needed under authorisation • Freeze Dryers • Chillers • Provide proof of experience of working on Freeze dryer • Air Handling Unit (EA and VP) . . Onsite Service Required Includes: On-site refrigeration maintenance service level agreement (1 x Refrigeration Technician & 1 x Assistant) for 8 hrs/day x 5 days per week for a period of 6 months. Must include 24/7 emergency standby support with a maximum on-site response time of 1 hour. 100 hours overtime for 1 Refrigeration Technician and 100 hours for 1 Assistant to be included in quote. Refrigeration Technician must be trade-tested with minimum 3 years of industrial refrigeration experience. Must be competent to maintain air conditioners, Chillers, cold rooms, and freezer rooms. Refrigeration Technician must hold a valid SAQCCA Gas Authorised Technician card. CVs of technician and assistant must be included in quotation. Any new refrigeration units (including refrigerators, air conditioners, incubators and cold rooms), gas, materials, consumables, replacement parts, etc required must be supplied at proven retail cost plus a mark-up of maximum 8% (to be included in the SLA) The refrigeration maintenance service team must be equipped with the necessary tools of the trade and must have their own transport to and from site and have sufficient cash flow to purchase materials and spares as required. A standard hardcopy safety file must be allowed for and submitted before any on-site work commences. Additional Requirements to Note: OBP reserves the right to check competency from the potential suppliers using any acceptable engineering measures. All parts, components and services provided will be subjected to not less than 6 months warranty. Performance bonds up to 8% of the whole invoice may be withhold as a guarantee and paid once the 6 months warranty period has elapsed. Agreements meetings will be conducted between supplier and OBP (i.e., legal, finance, procurement, and engineering departments) [ ] 2025/08/04 11:00:00 No 2025/08/11 15:00:00