RFQ/OBP267/2026/27
Renovation of Security Control Room
RFQ/OBP267/2026/27
SECURITY CONTROL ROOM SCOPE OF WORK 1.Control Room I. Remove 2x Aluminium windows 1700x850mm II. Remove 1x Roller door 4000x1500mm III. Remove 4000mmx 900mm granite top IV. Remove all tiles on the wall 24m² inside the control room V. Prepare and paint the security control room with colour chosen by the end-user VI. Prepare and paint the control room ceiling 22m² VII. Repair the lights VIII. Close the openings with brick-and-mortar (8m²) where roller doors and window removed. IX. Supply and install 1800 BTU air-conditioner (Reliable brand) X. Supply and Install 1x G3 Bandit door on a Sally Port (Airlock) with ISO panel on the walk-through side. XI. Supply and install 1x full view aluminium glass door inside the control room airlock. XII. Supply and install door closer mechanism that carry the weight of the three doors at the control room. XIII. Supply and Install 1x G3 Bandit door into the remove window space, with an escape closing handle mechanism. XIV. Build one-line exterior wall with brick and mortar around the control room for 1420mm Foundation: a. 400mm wide X 400mm deep b. 4Y 10 longitudinal bars (2 top + bottom) c. R8 links @ 300mm centres d. 50mm concrete cover e. 20MPa concrete. XV. Bullet Proof stainless steel Tinted window 600x600 with shallow pass-through tray for issuing firearms. Compliance with SANS 1263:2013-part 3 class RC to provide capability against a 7.62 mm x 51mm. (Glass thickness of 40mm) XVI. 14.Supply and install the floor carpet 23m² - Heavy duty Polypropylene Grey Carpet 2.Server Room I. Supply and install 16mm rebar steel bars to reinforce the ceiling for 4.2m² (Black painted) 200mmX200mm square II. Raised the floor by 100mm with concrete and tile the floor (3200mmx1200mm) III. Install Charcoal Security burglar sliding folding gate fully frame design with double rows of upright bars fitted with single Cylinder locking mechanism. IV. Supply and install 1200 BTU (Reliable brand) 3.Security Office I. Install and Supply ISO panel wall for 2500x3000mm wall. II. Install and Supply ISO panel wall for 2500x3000mm wall. III. Put frosted look on the aluminium glass door to access the office with Cylinder locking mechanism IV. Remove wall tiles for 15m², prepare and paint the wall. V. Prepare and paint the room ceiling VI. Repair the faulty lights VII. Remove and decommission the hand wash basin pipes. VIII. Supply and install air conditioner 1200 BTU (Reliable brand) 4.Main door I. Install Charcoal Security burglar sliding folding gate fully frame design with double rows of upright bars fitted with single Cylinder locking mechanism. II. Supply and Install Cylinder locking mechanism. 5.Main Access Verenda I. Supply and install shade canopy with Chromadek roof sheeting for (shade) and rain 3000mmx5500mm. II. Supply and install 3x LED 100W spotlight outside the security control room. 6.Main Hall I. Repair 2x sliding doors and install a locking mechanism that lock on both sides. II. Install and supply 2x Charcoal Security burglar folding gate fully frame design with single Cylinder locking mechanism. 2X 3000mmX2100mm III. Repair the lighting 7.Passage to the bathroom I. Supply and Install 2x Charcoal Security burglar folding gate fully frame design with double cylinder locking mechanism. 1850mmx2600mm II. Remove damaged tiles and install new one. 8.Kitchen I. Demolish walls and remove two doors. II. Install kitchen cupboards with three doors and single sink. (1200mmx450mmx800mm veneered Particle board) III. Install Kitchen cupboards with three doors attached to the wall (1200mmx450mmx400mm veneered Particle board) IV. Connect the drainage pipes to the sewage line. V. Decommissioning of the toilets from the sewage pipes VI. Supply and Instal stainless steel single sink tap VII. Install 3x plugs for 3 appliances with the connection of 20amp circuit breaker on the DB VIII. Repair the faulty lights 9.Bathroom I. Remove the male urinary and decommission the pipes. II. Supply and install locking mechanism on the main access door. 10.Signage installation I. Security Control room II. Security supervisor III. Female and male bathroom IV. Kitchen V. Server room
Request for Quote
2026/10/29 12:00:00
2026/10/22 12:00:00