RFQ/OBP329/2026/27
BV Supply, Removal and Installation of ISO doors
RFQ/OBP329/2026/27
Phase 1: Pre-Construction & Cleanroom Containment • Site Surveys: Verify exact structural opening dimensions for all 26 door locations prior to manufacturing the ISO doors. • Area Isolation: Set up temporary dust-containment barriers (e.g., heavy-duty zip-wall plastic sheeting) around active zones to ensure wood fibers and masonry dust do not cross-contaminate active or adjacent clean areas. • HVAC / Pressure Control: Coordinate with facility management regarding differential pressure systems. Temporarily seal affected ventilation paths if necessary. Phase 2: Demolition & Soft Stripping • Dismantling: Unhinge and remove all 17 single and 9 double timber door leaves using manual hand tools. • Frame Removal: Carefully extract the existing wooden frames and architraves from the brickwork/masonry or drywall partition walls without causing structural damage. • Waste Management: Transport all discarded wood, hardware, and debris away from the controlled facility into dedicated skips for lawful off-site disposal. Clean and vacuum the structural openings. Phase 3: Structural Prep & Substrate Modification • Wall Rectification: Repair, square, and smooth out the masonry or drywall reveals to ensure proper alignment for the new flush-frame ISO profiles. • Sealing Surface Prep: Clean substrates to guarantee a 100% airtight bond for cleanroom-grade antimicrobial sealants. Phase 4: Supply & Installation of Pharmaceutical ISO Systems • Door & Frame Assembly: Install the new pharmaceutical ISO doors. Both frames and leaves must feature a smooth, non-porous, chemical-resistant finish (typically GRP/GRP-clad or high-grade stainless steel) capable of withstanding aggressive cleanroom biocide washdowns. • Flush Integration: Ensure the door frame seamlessly integrates with the wall panel or masonry finish, leaving no ledge or lip where dust or micro-organisms can accumulate. • Hardware & Interlocking Alignment: • Mount stainless steel kick plates flush on both sides of the bottom of the doors (or per facility standard) to protect against cart and foot traffic. • Install heavy-duty overhead door closers calibrated to maintain proper latching against existing room differential pressures without disrupting the cleanroom airflow. • Affix medical/cleanroom-grade gaskets and drop-downs to ensure an airtight perimeter seal when closed. Phase 5: Commissioning & Validation • Operational Testing: Test all 26 doors to ensure smooth swing, proper self-closing alignment, latching accuracy, and airtight seals. • Differential Pressure Testing: Confirm that the facility's cleanroom pressure cascades are not compromised by the new door tolerances. • Final Sanitization: Deep-clean and disinfect the doors and the surrounding workspaces using facility-approved sterile cleaning agents.
Request for Quote
2026/12/09 11:00:00
No