RFQ/OBP262/2026/27
Supply and Apply Laboratory Epoxy 550m square
RFQ/OBP262/2026/27
BILL OF QUANTITIES (BOQ) Epoxy Flooring Project – 4–5 mm (Laboratory Grade) Area: 550 m² SECTION 1: PRELIMINARIES & GENERAL Item Description Unit Qty Rate (R) Amount (R) 1.1 Site establishment, access, and safety setup Item 1 1.2 Protection of walls, equipment, and surrounding areas Item 1 1.3 Supervision and project management Item 1 SECTION 2: REMOVAL WORKS Item Description Unit Qty Rate (R) Amount (R) 2.1 Remove existing rubber mats m² 550 2.2 Scrape off existing floor coating/residue m² 550 2.3 Load, transport, and dispose of waste material Item 1 SECTION 3: SURFACE PREPARATION Item Description Unit Qty Rate (R) Amount (R) 3.1 Mechanical grinding of concrete surface m² 550 3.2 Cleaning and vacuuming of surface m² 550 3.3 Repair cracks, holes, and damaged areas m² 550 3.4 Prepare surface to required profile (CSP 2–4) m² 550 SECTION 4: EPOXY FLOORING SYSTEM (4–5 mm) Item Description Unit Qty Rate (R) Amount (R) 4.1 Supply and apply epoxy primer m² 550 4.2 Supply and install heavy-duty epoxy screed (4–5 mm thick) m² 550 4.3 Supply and apply chemical-resistant top coat m² 550 SECTION 5: LABOUR & EQUIPMENT Item Description Unit Qty Rate (R) Amount (R) 5.1 Skilled labour for epoxy installation m² 550 5.2 Use of equipment (grinders, mixers, vacuums) Item 1 SECTION 6: QUALITY CONTROL & TESTING Item Description Unit Qty Rate (R) Amount (R) 6.1 Adhesion (pull-off) testing Item 1 6.2 Thickness and quality inspection Item 1 SECTION 7: CLEANING & HANDOVER Item Description Unit Qty Rate (R) Amount (R) 7.1 Final cleaning of completed area Item 1 7.2 Removal of equipment and site clearance Item 1 7.3 Handover with maintenance guidelines Item 1 SECTION 8: GUARANTEE Item Description Unit Qty Rate (R) Amount (R) 8.1 12-month workmanship guarantee Item 1 8.2 Manufacturer warranty documentation Item 1 Notes: - All quantities must be verified on site before pricing - Contractor must price all items listed above - No item may be left unpriced (in tender stage) - Work must comply with SANS/SABS standards
Request for Quote
2026/10/29 08:00:00
2026/10/22 10:00:00