RFQ/OBP308/2026/27

The appointment of a service provider to Supply, Delivery and Removal & Installation FD Area Doors.
RFQ/OBP308/2026/27
1. Project Objective & Overview The objective of this project is to decommission, remove, and safely dispose of three (3) existing specialized doors and supply, deliver, and install three (3) brand new replacement doors in the Freeze Dryer Area. The replacement includes: • Two (2) Emergency Single-Leaf Doors • One (1) ISO / Cleanroom Door Because this work takes place in a Freeze Dryer area, all materials, seals, and installation methods must comply with strict environmental control, insulation, and hygienic standards (e.g., GMP/cleanroom standards if applicable). 2. Detailed Scope of Work Phase 1: Site Preparation & Demolition • Site Survey: Contractor must verify all structural opening dimensions, wall thicknesses, and clearances before manufacturing. • Containment & Protection: Set up temporary dust/containment barriers to protect the freeze-drying equipment and surrounding clean environment from debris. • Removal: Carefully dismantle and remove the existing 2x emergency doors and 1x ISO door, including frames, tracks, closers, and hardware. • Disposal: Safely transport and legally dispose of all old doors and debris off-site. Phase 2: Supply and Material Specifications The contractor must supply all new doors, frames, hardware, and sealing materials matching or exceeding the following minimum specifications: A. Emergency Single-Leaf Doors (Qty: 2) • Type: Single-leaf, outward-swinging emergency exit doors. • Hardware: Heavy-duty panic/crash bars for quick egress, heavy-duty hinges, and automatic door closers. • Sealing: Perimeter gaskets ensuring an airtight/weather-tight seal when closed to maintain room pressure/temperature. • Signage: Integrated "Emergency Exit / Push to Open" signage. B. ISO / Cleanroom Door (Qty: 1) • Type: High-performance ISO-rated door (flush surface design to prevent dust accumulation). • Material: Corrosion-resistant material (e.g., 304/316 Stainless Steel or high-pressure laminate suited for chemical washdowns). • Sealing: Interlocking or heavy-duty airtight drop-seals to maintain strict pressure differentials. • Vision Panel: Double-glazed, flush-mounted vision glass/window (if required). • Hardware: Hygienic lever handles, heavy-duty concealed or cleanroom-grade hinges, and an automatic closer. Phase 3: Installation & Commissioning • Frame Installation: Anchor and seal the new door frames into the existing wall structures, ensuring they are perfectly plumb and level. • Hanging & Alignment: Install door leaves and adjust all hardware for smooth, effortless operation. • Sealing & Caulking: Apply high-grade, mold-resistant, food/pharma-safe silicone sealant around all frame-to-wall joints. • Testing: • Test emergency doors to ensure immediate unlatching when panic bars are depressed. • Test the ISO door to verify positive/negative pressure seal integrity and proper latching.
Request for Quote
2026/12/11 10:00:00
No